Industrial Automation Abb Dstd 306 57160001-Sh Companies – ABB 07KT97 GJR5253000R0160 PLC Central unit – RuiMingSheng
Industrial Automation Abb Dstd 306 57160001-Sh Companies – ABB 07KT97 GJR5253000R0160 PLC Central unit – RuiMingSheng Detail:
Description
Manufacture | ABB |
Model | 07KT97 |
Ordering information | GJR5253000R0160
GJR5253000R0270 GJR5253000R0278 GJR5253000R0280 |
Catalog | AC31 |
Description | 07KT97 PLC Central unit, 24V DC |
Origin | Germany (DE) |
HS Code | 85389091 |
Dimension | 16cm*16cm*12cm |
Weight | 0.8kg |
Details
The basic unit 07 KT 97 R200 is the standard device for all applications. In addition, there are basic units with reduced
performance (e.g. 07 KT 95 or 07 KT 96) as well as ones with extended performance (e.g. 07 KT 97 R260 with
ARCNET connection, 07 KT 97 R0220 with PROFIBUS connection and 07 KT 97 R0262 with both ARCNET and
PROFIBUS connection). A comparison table is given on page 3. This document describes the basic unit 07 KT 97
R200 and then adds the data sheets of the other devices which only show the differences.
07KT97 have below ordering information.
ABB 07KT97 GJR5253000R0100
ABB 07KT97 GJR5253000R0200
ABB 07KT97 GJR5253000R0160
ABB 07KT97 GJR5253000R0270
ABB 07KT97 GJR5253000R0278
ABB 07KT97 GJR5253000R0280
Datasheet link
Product detail pictures:
Related Product Guide:
Good quality comes to start with; service is foremost; organization is cooperation" is our enterprise philosophy which is regularly observed and pursued by our firm for Industrial Automation Abb Dstd 306 57160001-Sh Companies – ABB 07KT97 GJR5253000R0160 PLC Central unit – RuiMingSheng , The product will supply to all over the world, such as: Buenos Aires, Greece, Peru, we sincerely hope to establish a good and long-term business relationship with your esteemed company through this opportunity, based on equality, mutual benefit and win-win business from now to the future. "Your satisfaction is our happiness".
By Yannick Vergoz from Iran - 2018.12.05 13:53
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Queena from Germany - 2017.11.20 15:58